A high load capacity Megashor truss and prop solution, devised by RMD Kwikform, was used by joint venture contractor, CSM, for the construction of approach viaducts for the M2 Medway Bridge, as part of the Cobham to Junction 4 widening project.

The contract involved the construction of 82-metre span in-situ concrete viaducts, supported on huge Megatrusses and inclined Megashor props. It also called for the provision of wall, slab and cantilevered deck formwork for the posttension twin box girder viaduct. In addition, the contract utilisind substantial quantities of RMD Kwikform’s Kwikstage shoring system, Superslim Soldiers and Alform Beams, Alsec under-slab access and the Paraslim and Webtie modular composite bridge deck formwork systems.

Eight 6.3-metre deep, 128-metre long Megatrusses were used for each span, each having a bending moment capacity in excess of 13,000kNm. The Warren-type truss was constructed from standard modular Megashor sections that work in tandem with Superslim Soldiers lacing and standard Rapid Tie and flat braces, to provide the required lateral stiffness and wind resistance. In the most highly loaded areas of the truss, standard 1,000kN Megashor sections were replaced by 1,400kN Megashor Plus that were designed especially for this contract.

The Megatruss was assembled at ground level and raised into position. Climbing Jacks were mounted on 100mm square climbing bars restrained to the viaduct piers. Once raised to working level, the inclined Megashor props were fixed to the pile caps at the base of the piers and winched up and fixed to the truss lower chords by the insertion of 100mm diameter high yield pins in special node connections. The base slab was then cast, followed by the walls and top slab.

The inclined props incorporated specially designed base units that enabled the use of 300- tonne hydraulic jacks to measure and adjust prop loads and extensions continuously during sensitive stages of construction.

Dismantling was achieved by simultaneously unloading the props using these hydraulic jacks. The props were lowered to the ground and removed. The trusses were then brought down two metres, using the climbing jacks, before being secured in place to allow inspection of the base slab soffit. The assembly was then lowered to the ground where the trusses were split into three sections for advancing using multi wheeled transporters in true “Thunderbirds” style.

Any length adjustment to accommodate the different lengths between piers was then carried out, and the erection sequence was repeated for the next span. In total, the contract called for 16 trusses and 12 sets of four raking props. This compares with an earlier proposal that would have necessitated 24 trusses and 12 sets of six props. The new proposal was selected due to the significant reduction in material and transport costs, less weight and substantially reduced labour and programme requirements.

What would you like to do next?

Download Brochures

Print

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Contact Us

If you would like to know more, or have a project we can help you deliver, please get in touch with us today.

Call to Action

Gareth Richards

Managing Director - UAE

+971 6 502 5888

Contact Gareth Richards

  • This field is for validation purposes and should be left unchanged.

Projects View All >

Dubai Canal Bridge, UAE

Dubai Canal Bridge, UAE

FIND OUT MORE >
Mall of the Emirates, Dubai

Mall of the Emirates, Dubai

FIND OUT MORE >

"The Avenues" Shopping Mall, Manama, Bahrain

FIND OUT MORE >
Al Amerat Water Waste Project, Sultanate of Oman

Al Amerat Water Waste Project, Sultanate of Oman

FIND OUT MORE >

Videos | RMD Kwikform.tv View All >

Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >
Unique UK and Norwegian engineering collaboration on Fjord quay
.tv

Unique UK and Norwegian engineering collaboration on Fjord quay

FIND OUT MORE >