Megashor Supports 195 Tonne Gantry Crane Removal
At and active nuclear power plant in Switzerland, RMD Kwikform has supplied specialist contractor VSL Heavy Lifting with a bespoke solution, involving the construction of 26 metre high Megashor shoring towers, which have been used to replace a 195 tonne gantry bridge at the site in Goesgen. Download the case study to find out more.