Half Tunnel

Half Tunnel

Half Tunnel Formwork is a cost effective monolithic construction of walls and slabs for residential & commercial multi-storey buildings.

Half Tunnel 

Half Tunnel

Striking Procedure

Figure 1

Striking time for releasing Half Tunnel Formwork is dependent on the designed early strength of the cast concrete and is heavily influenced by the ambient climate. It is possible to strike and reposition Half Tunnel Formwork on a 24-hour cycle. In colder climates, it may prove effective to accelerate the concrete curing by the use of heaters or thermal blankets. Once the required concrete strength has been achieved, the reusable wall ties are removed. On wider rooms, central back propping to the floor slab may be required.

Figure 2

By releasing leveling jacks, the entire cell formwork is struck and lowered, central turnbuckles are released and banks of Half Tunnel units are rolled to the open end of the building where the C-Hook is attached. The formwork is removed for cleaning and repositioning, in preparation for the next cycle of construction.

What would you like to do next?

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Please contact us for further information

At RMD Kwikform we are proud to be part of a global business recognised world wide for our reputation for combining engineering expertise with high levels of safety and cost effective solutions.

Call to Action

Hamish Bowden

Regional Director – APAC

+63 917 5266760

Contact Hamish Bowden

  • This field is for validation purposes and should be left unchanged.

Videos | RMD Kwikform.tv View All >

Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >
Unique UK and Norwegian engineering collaboration on Fjord quay
.tv

Unique UK and Norwegian engineering collaboration on Fjord quay

FIND OUT MORE >

Projects View All >

Manila Bay Resort

Manila Bay Resort

FIND OUT MORE >
Bangkok Airport Satellite Terminal Expansion

Bangkok Airport Satellite Terminal Expansion

FIND OUT MORE >
Hong Kong Zhuhai Macao Bridge

Hong Kong Zhuhai Macao Bridge

FIND OUT MORE >
Castell Coch, Wales

Castell Coch, Wales

FIND OUT MORE >