Projects 

Lusail Tunel, Qatar

Article Details

  • SYSTEM Formwork, Shoring
  • PRODUCT Alshor Plus, GTX Beams, Megashor, Superslim Soldiers
  • STRUCTURE TYPE Tunnels
  • REGION MENA

RMD Kwikform is building on its tunnelling experience in Qatar and the Middle East, supporting Qatar Diar Vinci Grand Projects Joint Venture (QDVC), with the construction of a 6.5km tunnel.

The tunnel will accommodate train lines for phase 2B of the Lusail Light Rail Transit system, serving the residents of the new Lusail City, which is currently under construction in Qatar. Having already supported the construction of tunnels on the first phase of the Lusail Light Rail Transit System, known as the Lusail LRT, RMD Kwikform has designed an integrated formwork and shoring solution for the second phase of the project.

Involving a wide range of its equipment and specials, designed and fabricated especially for the project, the solution is being used to construct part of the 6.5km long tunnel.

Tasked with achieving a four day turn around cycle, critical for the programme time targets of the project, RMD Kwikform designed, fabricated and supplied six complete sets of formwork and shoring, that could be used to cast the 1.2metre thick slabs and walls monolithically. Measuring 14 metres in length, each tunnel set used lightweight aluminium Alshor Plus shoring that was made up into specialist travellers. This in turn supported Superslim Soldiers steel primary and GTX secondary beams to form the tunnel roof slab. With Megashor heavy-duty shoring used as back propping, Superslim Soldiers and GTX Beams completed the overall design for the construction of the tunnel walls, creating a complete travelling tunnel set.

In addition to the tunnel construction phase of the project, RMD Kwikform has also been commissioned to design and supply all shoring and formwork to the tunnel pumping stations and ventilation shafts.

Commenting on the contract tender process, Les Ridsdale RMD Kwikform General Manager for Qatar said:

We have now been on the ground in Qatar for 11 years and in that time we have developed a very high level of experience and competence in tunnelling, in addition to being involved with other major infrastructure and building works. This experience was particularly important in winning that job, as it was an extremely competitive and involved tender process. Having proven our expertise on the construction of the New Doha Airport Tunnel in 2008/09, we were able to demonstrate how this experience, combined with our technical knowledge, commercial awareness and local base could benefit the project.

I think throughout the tender process, what was most important to QDVC was ensuring they selected a formwork and shoring provider that could help them achieve their programme safely, on budget and that could be trusted not to let them down. Having won the tender I think they were confident that we were that business.

Challenged with completing the tunnel in just 12 months, once QDVC had awarded the contract to RMD Kwikform, engineers were able to put the finishing touches to concept designs to identify the amount of equipment needed to support the job. This was then sourced both locally, with additional equipment brought in from the UAE.

What would you like to do next?

Download Brochures

Print

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Please contact us for further information

At RMD Kwikform we are proud to be part of a global business recognised world wide for our reputation for combining engineering expertise with high levels of safety and cost effective solutions.

Call to Action

Hamish Bowden

Regional Director – APAC

+63 917 5266760

Contact Hamish Bowden

  • This field is for validation purposes and should be left unchanged.

Projects View All >

Manila Bay Resort

Manila Bay Resort

FIND OUT MORE >
Bangkok Airport Satellite Terminal Expansion

Bangkok Airport Satellite Terminal Expansion

FIND OUT MORE >
Folsom Street - San Francisco

Folsom Street - San Francisco

FIND OUT MORE >
Royal Arsenal Riverside

Royal Arsenal Riverside

FIND OUT MORE >

Videos | RMD Kwikform.tv View All >

Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >
Unique UK and Norwegian engineering collaboration on Fjord quay
.tv

Unique UK and Norwegian engineering collaboration on Fjord quay

FIND OUT MORE >