This project was constructed on the side of a very steep, 53 degree cliff face. This meant that the land firstly had to be excavated and banked out. A large number of load bearing walls needed to be constructed and RMD’s Minima Panel system was utilized for these.
RMD’s Strongshor was used with timber and ply to support the podium slab which was 800mm thick and 800m2 in area; this was effectively where the typical floors commenced, which gave a base for the Kwikstage Access to rest on. The Kwikstage Access covered the perimeter of the building. The scaffold at full height was 27m tall.