x

Document Download

Please complete your details to download the document.

We will not pass on your details to any third party.

  • This field is for validation purposes and should be left unchanged.
Ascent-F

Ascent-F

Ascent-F Guided Climbing formwork for hi-rise concrete construction

Ascent-F – Climbing Formwork 

Ascent-F – Climbing Formwork

In Detail

Bracket & Hydraulics

Wall Bracket - Attach and guide

The Ascent Wall Bracket is used to attach the masts to the wall and provide guidance during lifting. Smoothly chamfered leading and trailing edges guide the mast through the wall brackets during lifting or lowering.

Wall Bracket - Optimised for usage

Optimised to reduce weight and make manual handling easier. Other features include - removable mast guides which allow equipment to be craned directly away from the wall and an integrated handle, for easy carrying.

Wall Bracket - Cost reducing

The bracket is lightweight at only 13.2kg. A projecting boss on the rear of the bracket locates into the recess on the embedded anchor, enabling a labour saving single-man fix or removal of the bracket from the wall.

Hydraulic system - Maintain cycle times

Enables movement of the platforms without the need for a crane, useful during conditions when the crane is either winded off or is servicing other trades, allowing work to continue and maintaining fast cycle times.

Hydraulic system - Simple connection

The system attaches to the bracket using a simple pin connection and is fully interchangeable between platform modules

Hydraulic system - Utilise onsite power

Movement is controlled by a single unit powered by a standard 110v site supply with equal raise speeds for safe, smooth movement.

What would you like to do next?

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Need more Information about this?

If you want to learn more about how we can help bring your structures to life, get in touch today

Call to Action

Carol Herald

Customer Service

0800 389 8231

Contact Carol Herald

  • This field is for validation purposes and should be left unchanged.

Videos | RMD Kwikform.tv View All >

Tubeshor 1060 & GeoBrace 550 Animation
.tv

Tubeshor 1060 & GeoBrace 550 Animation

FIND OUT MORE >
Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >

Projects View All >

RMD KWIKFORM'S Ground Shoring Supports CPC Civils with Water Network Expansion

RMD KWIKFORM'S Ground Shoring Supports CPC Civils with Water Network Expansion

FIND OUT MORE >
G-TEM's Manufacturing Facility

G-TEM's Manufacturing Facility

FIND OUT MORE >
Manila Bay Resort

Manila Bay Resort

FIND OUT MORE >
Bangkok Airport Satellite Terminal Expansion

Bangkok Airport Satellite Terminal Expansion

FIND OUT MORE >