With a large dose of formwork and shoring from RMD Kwikform Middle East, construction specialist J and P have brought to life one of the largest hospital complexes in the world, situated in Doha, Qatar.

Replacing the original Hamas Hospital the new $118 million Hamad Medical City and Car Park is set to become a centre of excellence in many ways and a welcome edition to the flourishing city of Doha.

Funded by Qatar Government, the construction of the new hospital complex commenced in August 2005 with the main concrete construction completed in June 2006. The hospital itself supplies free healthcare to all and has become home to a world class Oncology department.

Capable of housing over a thousand patients/beds at any one time, the vast site comprises numerous buildings, including apartment blocks for on-site nursing and staff accommodation, shops and hundreds of car parking spaces. With a footprint of more than 350,000 square metres, the main framework of the structure consists of three tower block departments connected by three podium levels and an underground car park, all of which were constructed using Alshor Plus Framework from RMD Kwikform Middle East.

The vast scale of the project saw 1,100 tonnes of RMD Kwikform Middle East equipment used to form 285,000 square metres of slabs 285mm to 1,000mm thick. Averaging 18,000 square metres a month for 16 months, the largest pour in any one month saw 26,000 square metres of slab formed.

With the availability of skilled labour and time being a key issue in the project, the use of RMD Kwikform’s industry leading aluminium shoring system, Alshor Plus was specified as the main equipment for the job.  Using the product for the first time, J and P soon recognised the numerous possibilities made available by the versatile Alshor Plus system, figuring our additional uses for the system before the first delivery arrived on-site. In addition to the more traditional use of the project, flying tables, mobile back propping tables and heavily loaded 26m high supports were designed to assist with the construction.

Commenting on the use of Alshor Plus, J and P Project Manager, Ken Patterson said:

We recently worked with RMD Kwikform Middle East on a large project in Dubai, using their Kwikstage Propping and Decking product, which we purchased to compliment our existing stock. Having completed the Dubai project we were looking for a cost effective solution for Hamad Medical City. A timely introduction to Alshor Plus was made by RMD Kwikform Middle East before the project formwork and falsework designs had been signed off. Comparing alternative solution with Alshor Plus, we were able to make serious reductions in erection time and labour cost that made the hire of Alshor Plus much more cost effective than other available options.

Outlining the construction method used for the project, RMD Kwikform Sales Representative, Werner Wellmanns said:

The main building and attached car park were a post tension construction, making it a rapid construction cycle. Unlike other similar projects there was no duplication until J and P reach the typical floors of the tower block, so on 70% of the project, every pour area was different. In order to reduce the programme management time the project required a product that was versatile enough to handle all the building design changes. By using Alshor Plus, J and P were able to erect and dismantle the system in a quarter of the time it would have taken other options.

Due to the scale of the project, RMD Kwikform not only had a team of engineers on hand to ensure the safe use of equipment and erection to the correct plans, the sheer volume of equipment called for a specially located supply yard, housing move than 80 trailers of equipment, weighing some 1,100 tonnes. With changing stock and equipment constantly being delivered or removed from site, the management of the whole supply chain process was both complex and time critical.

 

What would you like to do next?

Download Brochures

Print

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Need more Information about this?

If you want to learn more about how we can help bring your structures to life, get in touch today

Call to Action

Carol Herald

Customer Service

0800 389 8231

Contact Carol Herald

  • This field is for validation purposes and should be left unchanged.

Projects View All >

RMD KWIKFORM'S GROUND SHORING SUPPORTS CPC CIVILS WITH WATER NETWORK EXPANSION

RMD KWIKFORM'S GROUND SHORING SUPPORTS CPC CIVILS WITH WATER NETWORK EXPANSION

FIND OUT MORE >
G-TEM's Manufacturing Facility

G-TEM's Manufacturing Facility

FIND OUT MORE >
Manila Bay Resort

Manila Bay Resort

FIND OUT MORE >
Bangkok Airport Satellite Terminal Expansion

Bangkok Airport Satellite Terminal Expansion

FIND OUT MORE >

Videos | RMD Kwikform.tv View All >

Tubeshor 1060 & GeoBrace 550 Animation
.tv

Tubeshor 1060 & GeoBrace 550 Animation

FIND OUT MORE >
Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >