M2 Medway Bridge, viaducts

Article Details

  • SYSTEM Propping
  • PRODUCT Megashor
  • STRUCTURE TYPE Bridges
  • REGION Europe

RMD Kwikform supply Megashor truss & prop solution.

High load prop & truss solution – Megashor, used in construction of the approach viaducts for the M2 Medway Bridge, Rochester.

A high load capacity Megashor truss and prop solution, devised by RMD Kwikform, was used by joint venture contractor, CSM, for the construction of approach viaducts for the M2 Medway Bridge, as part of the Cobham to Junction 4 widening project.

situ concrete viaducts, supported on huge Megatrusses and inclined Megashor props. It also called for the provision of wall, slab and cantilevered deck formwork for the post-tension twin box girder viaduct. In addition, the contract utilised a Kwikstage shoring system, Superslim Soldiers and Alform Beams, Alsec under-slab access and the Paraslim and Webtie modular composite bridge deck formwork systems.

metre long Megatrusses were used for each span, each having a bending moment capacity in excess of 13,000kNm. The Warren-type truss was constructed from standard modular Megashor sections that work in tandem with Superslim Soldiers lacing and standard Rapid Tie and flat braces, to provide the required lateral stiffness and wind resistance. In the most highly loaded areas of the truss, standard 1,000kN Megashor sections were replaced by 1,400kN Megashor Plus that were designed especially for this contract.

The Megatruss was assembled at ground level and raised into position. Climbing Jacks were mounted on 100mm square climbing bars restrained to the viaduct piers. Once raised to working level, the inclined Megashor props were fixed to the pile caps at the base of the piers and winched up and fixed to the truss lower chords by the insertion of 100mm diameter high yield pins in special node connections. The base slab was then cast, followed by the walls and top slab.

The inclined props incorporated specially designed base units that enabled the use of 300- tonne hydraulic jacks to measure and adjust prop loads and extensions continuously during sensitive stages of construction.

Dismantling was achieved by simultaneously unloading the props using these hydraulic jacks. The props were lowered to the ground and removed. The trusses were then brought down two metres, using the climbing jacks, before being secured in place to allow inspection of the base slab soffi t. The assembly was then lowered to the ground where the trusses were split into three sections for advancing using multi wheeled style. Any length adjustment to accommodate the different lengths between piers was then carried out, and the erection sequence was repeated for the next span.

Programme & costs reduced

In total, the contract called for 16 trusses and 12 sets of four raking props. This compares with an earlier proposal that would have necessitated 24 trusses and 12 sets of six props. The new proposal was selected due to the significant reduction in material and transport costs, less weight and substantially reduced labour and programme requirements.

 

What would you like to do next?

Download Brochures

Print

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Need more Information about this?

If you want to learn more about how we can help bring your structures to life, get in touch today

Call to Action

Carol Herald

Customer Service

0800 389 8231

Contact Carol Herald

  • This field is for validation purposes and should be left unchanged.

Projects View All >

RMD KWIKFORM'S Ground Shoring Supports CPC Civils with Water Network Expansion

RMD KWIKFORM'S Ground Shoring Supports CPC Civils with Water Network Expansion

FIND OUT MORE >
G-TEM's Manufacturing Facility

G-TEM's Manufacturing Facility

FIND OUT MORE >
Manila Bay Resort

Manila Bay Resort

FIND OUT MORE >
Bangkok Airport Satellite Terminal Expansion

Bangkok Airport Satellite Terminal Expansion

FIND OUT MORE >

Videos | RMD Kwikform.tv View All >

Tubeshor 1060 & GeoBrace 550 Animation
.tv

Tubeshor 1060 & GeoBrace 550 Animation

FIND OUT MORE >
Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >