New Wembley Stadium

Article Details

  • SYSTEM Soffit Support
  • PRODUCT Alshor Plus, Aluminium Beams
  • STRUCTURE TYPE Leisure, Stadiums
  • REGION Europe

RMD equipment used to build new home for England's football team and major concerts and events.

RMD Kwikform’s lightweight aluminium Alshor Plus shoring system was used for the construction of the new Wembley National Stadium in London, supporting all of the 250mm to 2400mm thick in-situ reinforced concrete slabs.

The high-load-capacity shoring system is being used by PC Harrington to provide around 40,000 square metres of support and back propping for the floors, which take up approximately one third of the Stadium’s one kilometre circumference. The equipment is being used to produce a series of mobile tables that – despite the awkward shape of the building – is dramatically increasing productivity, reducing site labour costs and hence minimising the amount of equipment required. According to PC Harrington, this has resulted in substantial savings in construction time and a reduction of the company’s site labour by around 20%.

By the completion of the project, around 30 different sizes and configurations of tables will have been used. The largest Alshor Plus table measures 7.2 metres by 6.0 metres and weighs approximately two tonnes, while the smallest table is 3.6 metres by 3.2 metres and weighs one tonne. All are around seven metres high.

Infill areas between the tables and adjoining stairwells, columns and beams are being completed using site-assembled “static” sections of the shoring system. Each floor, which has around 300 table positions, supporting approximately 75 percent of the total slab area, is being completed in up to 32 pours – the largest of which is approximately 1,200 square metres.

The primary bearers at soffit level are 225mm deep RMD Kwikform Albeams, chosen for their high bending, low deflection and concentrated load capacity. These are bolted to U-heads at the top of each Alshor Plus leg. RMD Kwikform’s 150mm deep Alform and Alsec beams are incorporated as the secondary bearers, fixed to the Albeams using wedge action clamps.

Alshor Plus components are stored and tables are assembled in a secure area adjacent to the slabs under construction. Once assembled, the tables are craned into approximate position and are then manually and efficiently manoeuvred into their precise required location by a team of just two men using the innovative and smooth acting Alshor Plus Castor Units.

What would you like to do next?

Download Brochures

Print

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

Need more Information about this?

If you want to learn more about how we can help bring your structures to life, get in touch today

Call to Action

Carol Herald

Customer Service

0800 389 8231

Contact Carol Herald

  • This field is for validation purposes and should be left unchanged.

Projects View All >

Hong Kong Zhuhai Macao Bridge

Hong Kong Zhuhai Macao Bridge

FIND OUT MORE >
Castell Coch, Wales

Castell Coch, Wales

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Cornubia Bridge, South Africa

Cornubia Bridge, South Africa

FIND OUT MORE >

Videos | RMD Kwikform.tv View All >

Tubeshor 1060 & GeoBrace 550 Animation
.tv

Tubeshor 1060 & GeoBrace 550 Animation

FIND OUT MORE >
Mersey Gateway Crossing - Astmoor Approach Viaduct
.tv

Mersey Gateway Crossing - Astmoor Approach Viaduct

FIND OUT MORE >
Bristol's Metrobus - Skew Bridge with Paraslim Safetie
.tv

Bristol's Metrobus - Skew Bridge with Paraslim Safetie

FIND OUT MORE >
Gort to Tuam Bypass
.tv

Gort to Tuam Bypass

FIND OUT MORE >